Technical description
The run-of-river power plant consists of the Mötschlach weir, the headrace channel and the Dionysen powerhouse.
Turbines and generators
The plant is equipped with two Kaplan turbines from 1949 (machine 1) and 1950 (machine 2), which have an output of 7,100 kW at a nominal flow rate of 55 m³/sec. Two directly coupled 8,000 kVA three-phase synchronous generators were installed. Both sets of machinery were rebuilt in 2000/01.
Transformers
A 20,000 kVA machine transformer raises the energy generated from 6.3 kV to 110 kV, transmission is carried out by a loop in the 110 kV double-circuit line from Bruck/Mur to Hessenberg.