Ecology & environmental protection
During construction of the new power plant between 2003 and 2006, a large number of ecological support measures were additionally undertaken, such as a fish ladder, thousands of newly placed plants and newly created small biotopes.
Fish bypass: The bypass waterbody has a length of approx. 390 metres and overcomes the 9.5 metre difference in water level at the weir system with an average gradient of 2.4%. The monitoring carried out in the lower waters in 2006 revealed the fish species grayling, brown and rainbow trout, loach, European bullhead, European chub, common roach, common bleak and three-spined stickleback, which is why the fish ladder is considered fully functional.