The run-of-river power plant at Wallsee-Mitterkirchen on the Danube lies between the towns of Wallsee in Lower Austria and Mitterkirchen in Upper Austria. The turbines from the 1960s will be replaced in the coming years. This revitalisation will significantly improve the efficiency of the Danube power plant.
The six old turbines will be removed and replaced with new ones by 2030. At the end of the revitalisation, the power plant will provide additional generation for a further 15,000 households. The investment amounts to around 62 million euros.
An open-field solar installation supplements generation on the power plant site. The installed capacity is 17 megawatts. To support the grid frequency, the "Blue Battery" has up to 10 megawatts of spare capacity available – fed from the electricity of the Danube power plant Wallsee-Mitterkirchen.
Additionally, a new PV facility on the site of the Danube power plant Wallsee-Mitterkirchen, which covers an area of 3 hectares and has a maximum output of 1.7 MW, generates as much as electricity as is consumed by about 600 households every year. The panels align themselves automatically to the sun to supply the optimal electricity yield.