Technical description
Turbines and generators: A vertically installed, six-nozzle Pelton turbine suppliers a maximum output of 9,900 kW. The impeller has a diameter of 1.42 metres, the nominal flow rate is 6 m³/sec. The directly coupled 14,700 kVA three-phase synchronous generator has a rated voltage of 6.3 kV.
Transformers: The generated energy is raised to 30 kV by a 16,000 kVA block transformer and conducted via an underground cable to the Schwarzenbach substation and to the interconnector to Trieben. In addition to the block transformer, the plant also has its own 250 kVA transformer for dropping the voltage from 30 kV to 400 V.
Weir system: The water in the Triebenbach is discharged on the left bank, just below the confluence of the Sunkbach. After the fine screen, the generating water arrives in the pressure tunnel through two tunnel inlet gates.