Owner: VERBUND Hydro Power GmbH
Operator: VERBUND Hydro Power GmbH
Commissioning: 1953
Type: Storage power plant
Country: Austria
Region: Carinthia
Waters: Mühldorferbach, Drava
Output: 23 MW
Annual output: 53,716 MWh
Turbine: Pelton
Connectivity: No fish bypass
Reisseck Daily Storage Power Plant
VERBUND's power plant at Reisseck is a storage power plant situated in the municipality of Kolbnitz in Carinthia. It was constructed from 1947 until 1953.
On the south side of the Reißeck Massif, the Riekenbach, Zwenbergbach and Mühldorferbach are tapped as the main feeders and fed into the Reißeck daily storage facility. These waters are used by two Pelton turbines with an output of 23,200 kW in the Kolbnitz power station.
Technical description
The Reißeck daily storage facility comprises the powerhouse in Kolbnitz and the Gondelwiese daily storage facility with a capacity of around 41,000 m³. The Hattelberg pumping station makes it possible to pump the water from the daily storage facility up to the annual storage facility on the Reißeck plateau.