The Gries run-of-river power plant was completed in 2019 as a joint venture project on the Salzach river in the municipality of Gries im Pinzgau.
The Gries run of river plant – in harmony with nature
Surrounded by high mountains and popular skiing regions such as Kaprun, Zell am See and the Rauriser Hochalmbahnen, winter tourism isn’t the only life in the Pinzgau region. In summer, too, many tourists make their way to these impressive mountains for their holidays. To ensure a tourism industry in harmony with nature, sustainable energy production is also a must. The hydropower plant in Gries makes an important contribution to this.
The natural gradient of the Salzach at Gries makes it the ideal location for the run of river plant. The power plant can be constructed here in a way that takes particular care of the river’s ecology. The project partners VERBUND and Salzburg AG worked with the renowned Salzburg Institute for Ecology during the planning phase. The impact on nature was kept as low as possible during the construction phase. Land restoration measures are invigorating biodiversity while a modern fish pass offers obstacle-free migration for the fish.